New apartment development in Samoens
Sustainability 20 Dec 2013 Gareth Jefferies

New apartment development in Samoens

This post is also available in: Français (French) Les Rivières des Montagnes is a new development right next to the Grand Massif Express in Samoens. It’s a prime location that is hard to beat. 250m from the lift and a 5 minute walk from the centre of Samoens . In the summer it’s a great […]

Les Rivières des Montagnes is a new development right next to the Grand Massif Express in Samoens. It’s a prime location that is hard to beat. 250m from the lift and a 5 minute walk from the centre of Samoens . In the summer it’s a great spot too, it’s next to the riverside path and only a short bike ride from the park and municipal swimming pool too.

near the ski lift

for sale in samoens

rivieresmontagnes4_10

rivieresmontagnes4_9

If you look at the map below you’ll clearly see the ski lift, swimming pool and edge of Samoens village centre. I’ve marked the plot in red too.

Samoens development

There are 17 apartments and a ski shop in the building. Currently there are 13 apartments left to sell (as of February 2014)

apartment samoens

We have one studio for sale 3 x 1 bedroom apartments, 3 x 2 bedroom apartments, 7 larger 2 bedroom apartments, one 3 bedroom and one 4 bedroom. I have listed them below.

#Apt 14 – studio
#Apt 4,6,9 – all 1 bedroom (#4 is SOLD)
#Apt 2,7,12 – 2 bedrooms (#7 is SOLD)
#Apt 3,5,8,10,11 – 2 bedrooms+study (#3 and #8 is SOLD)
Apt 13 – 2 bedrooms+study+store
Apt 15 – 2 bedrooms+mezz+study
#Apt 16 – 3 bedrooms + study
#Apt 17 – 4 bedrooms

#On our website

Appt. Rivières des Montagnes, 2
this property

Appt 5:
this property

Appt. Rivières des Montagnes, 6
this property

Appt 13:
this property

Appt 14
this property

Appt. Rivières des Montagnes, 16
this property

Appt 17:
this property

The price list is available here:

Price list only

The new apartments are due to be completed by early summer 2015. That might sound like some way in the future but it’s not. Construction has just started. There will have to be a break for winter. It will restart again in the Spring of 2014, then the major works will have to be completed by the end of 2014, when you think that there are 17 apartments and a ski shop to build that’s a big job! The building will need to be watertight by the Christmas 2014 so the internal finishing can take place over the following winter for completion at the end of Spring 2015.

Here is a picture of the works up to date (Dec 2013)

Current state of the works

and the advertising sign erected on the site.

for sale board

Contact Us

Have a question about a property or looking for something specific? Get in touch with our team.

First name
Last name
Email
Phone
Subject Message Tell us what you're looking for — e.g. preferred location, property type, budget range, timeframe, must-haves...

We Value Your Privacy

We use cookies to enhance your browsing experience, serve personalized ads or content, and analyze our traffic. By clicking "Accept All", you consent to our use of cookies.

We Value Your Privacy

Non-essential Cookies

These help us measure site traffic and remember your choices, like language and region. Turn them off if you prefer.

Essential Cookies

These cookies are necessary for the website to function and cannot be switched off. They are usually only set in response to actions made by you which amount to a request for services.

Always Active