Les Carroz is pushing ahead pt 2
Advice 25 Nov 2016 Gareth Jefferies

Les Carroz is pushing ahead pt 2

This post is also available in: Français (French) There was an important meeting in Les Carroz last night (24/11/16). We had thought it was about the proposed developments (more on this below) but it was actually about the PLU. The PLU is certainly important but only really to land owners. So I thought I’d take this […]

There was an important meeting in Les Carroz last night (24/11/16). We had thought it was about the proposed developments (more on this below) but it was actually about the PLU. The PLU is certainly important but only really to land owners.

So I thought I’d take this opportunity to list the proposed projects for Les Carroz. This list is distinct from pt 1. Pt 1 was about recently completed projects, this list is for the future.

les-carroz

  • Pictured above the new pedestrianised centre with improved traffic flow (tbc)
  • State of the art medical centre (this has started);
  • A new 400m2 tourist office (tbc);
  • New leisure facility as an extension to that which exists already (pool and wellness complex, sports hall, tennis courts and accrobranche (GoApe) comprising a 9-hole golf course along with VTT trails and summer walks. This can be adapted in the winter for cross country skiing, biathlon and snow shoeing (tbc);
  • The Funiflaine (tbc). According to the local newspaper the proposal is still very much supported but a new feasibility study is being undertaken, with a new route.

funiflaine-3
The Funiflaine is an ambitious plan to connect the motorway with the skiing at Flaine. The estimated cost is 84m€, mostly from the state.  The idea is 3 fold.

  1. To cut down on traffic through Les Carroz
  2. To make getting to Flaine more “sustainable” or better for the environment. It’s a reasonable idea. This will save 28km of winding driving. This takes 40min on a good day. It can take many hours on a snowy Saturday in the ski season. The lift should take half that time. Currently 250,000 holiday makers and 2oo,000 day trippers make the trip by car. They’d like all these people to go on the lift!
  3. With the convenience and a big car park it’s likely to divert day trippers from going up the motorway to Megeve, St Gervais and Chamonix. This isn’t one of the stated aims. It’s an obvious plus for the Grand Massif though.

The most recent route that had been proposed was  via Le Lays (just below Les Carroz) and then up to Flaine. I guess this was mainly to keep the commune of Les Carroz on board.

A potential revision has been suggested that would be to go straight from Magland to Flaine. And for a separate lift to be built connecting the entrance to Les Carroz (at Le Lays) to the Grand Massif via the Les Carroz slopes.

funiflaine-2

The original plan is in red and the new plan in black. The motorway is on the left and Flaine on the right.

Watch this space – we’ll keep you informed on any further developments!

 

 

Contact Us

Have a question about a property or looking for something specific? Get in touch with our team.

First name
Last name
Email
Phone
Subject Message Tell us what you're looking for — e.g. preferred location, property type, budget range, timeframe, must-haves...

We Value Your Privacy

We use cookies to enhance your browsing experience, serve personalized ads or content, and analyze our traffic. By clicking "Accept All", you consent to our use of cookies.

We Value Your Privacy

Non-essential Cookies

These help us measure site traffic and remember your choices, like language and region. Turn them off if you prefer.

Essential Cookies

These cookies are necessary for the website to function and cannot be switched off. They are usually only set in response to actions made by you which amount to a request for services.

Always Active